Engineering & Quality

Make technical decisions traceable.

CADOVEX Systems structures requirements, technical platforms, documentation and validation needs to create a robust basis for product, partner and project decisions.

Work areas

From requirements to validation.

01

Requirements

Define functions, operating conditions, interfaces and exclusion criteria.

02

Platform review

Compare existing technical platforms against the target requirements.

03

Supplier documents

Review reports, certificates, drawings and bills of material for consistency.

04

Gap analysis

Make deviations between existing platform and target application visible.

05

Validation planning

Structure testing, samples, pilots and evidence methods.

06

Change control

Assess technical changes and their impact in a traceable way.

Documentation

Quality needs a clean chain of evidence.

A certificate alone does not answer every question. Product variant, manufacturer, test standard, technical changes and target market need to match.

  • Verify the identity of manufacturer, product and report
  • Classify the test standard and scope
  • Assess changes compared with the tested variant
  • Resolve outstanding evidence before product release
Quality logic

Separate four levels clearly.

1

Manufacturing quality

Organisation, processes and quality management of the production site.

2

Product safety

Electrical, mechanical and functional safety requirements.

3

Performance

Airflow, heat recovery, sound and energy demand.

4

Market access

Labelling, technical documentation and regulatory obligations.

Testing and evidence concept

The required scope of testing and evidence is defined for each product on the basis of its technical configuration, intended application and target market. CADOVEX considers these requirements early in specification, documentation review and validation planning. This creates a transparent structure for test steps, responsibilities and outstanding evidence.

Structure the technical foundation together.

From requirements to validation planning.

Contact us